Spirax Sarco USA
Fax: (803) 714-2222
InsideSalesLeads@Spirax.com
http://www.SpiraxSarco.com/us/
Boiler Blowdown & CCD
The BCS 3 blowdown system is suitable for shell and water tube boilers and can be linked to energy/building management systems. The BCS 3 can handle boiler pressures up to 465 psig (32 barg). Additional features include:
- Continuous digital indication of TDS
- 4-20/0-20 mA output
- Self cleaning probe
- High TDS alarm
BCS 4 blowdown control system
The BCS 4 blowdown system is suitable for shell and water tube boilers and can be linked to energy/building management systems. The BCS 4 can handle boiler pressure up to 465 psig (32 barg).
User benefits
- Complete system package for easy installation
- Accurate TDS level control minimizes blowdown
- Reduces carryover of boiler water with steam
- Automatic control decreases need for supervision
Not all products are available in all markets. Please choose your National Spirax Sarco Web Site or Contact Us for further information.
What do I do now?
Find further information on Boiler Blowdown & CCD in the sections below, or get in touch for further assistance.
Contact us for advice from our engineers
- Help on sizing and selection
- Arrange a visit
- Answers & advice on products/applications
- Obtaining quotes & placing orders
Technical Information
Use our technical information sheets for a full technical specification of the product. They typically include:
- Pressure/temperature limits
- Materials
- Sizes & connections
- Dimensions & weights
- Capacity charts
- Ordering information
| Title | Reference Number | Issue | File Size | |
|---|---|---|---|---|
| 1-1/2" BCV 30 Blowdown Control Valve | - | - | 93 KB | |
| 1-1/2" BCV 31 Blowdown Control Valve | - | - | 172 KB | |
| 3/4" BCV 30 Blowdown Control Valve | - | - | 101 KB | |
| 3/4" BCV 31 Blowdown Control Valve | - | - | 182 KB | |
| BC 1100 Controller | - | - | 64 KB | |
| BC 3200 & BC 3210 Controllers | - | - | 66 KB | |
| BCV1 Solenoid Valve | - | - | 107 KB | |
| CP 30 Conductivity Probe | - | - | 76 KB | |
| CP32 Twin Tip Conductivity Probe | - | - | 66 KB | |
| MS 1 Conductivity Meter | - | - | 74 KB | |
| Recommended Pipeline Components for BCS1 Blowdown System | - | - | 59 KB | |
| S20 Sensor Chamber TP20 Temperature Sensor CP10 & PT12 | - | - | 61 KB |
Installation & Maintenance Instructions
Clear & accurate guidelines on installation & maintenance. They typically include:
- General safety information
- General product information
- Installation
- Commissioning
- Operation
- Maintenance
- Spare parts
| Title | Reference Number | Issue | File Size | |
|---|---|---|---|---|
| BC1100 Controller | - | - | 111 KB | |
| BC3200 and BC3210 Blowdown Controllers | - | - | 187 KB | |
| BCS 1 Pipeline Set | - | - | 127 KB | |
| BCV30 Blowdown Control Valve | - | - | 169 KB | |
| BCV31 Blowdown Control Valve | - | - | 184 KB | |
| BT1000 Boiler Blowdown Timer | - | - | 73 KB | |
| CP 10 Sensor | - | - | 36 KB | |
| CP 30 Conductivity Probe | - | - | 82 KB | |
| CP32 Conductivity Probe | - | - | 75 KB | |
| MS1 Conducitivity Meter | - | - | 90 KB |
CAD Drawings
CAD drawings enabling you to see exactly how the product is constructed. You can also drop these into your own schematics.
Contact us for advice from our engineers
- Help on sizing and selection
- Arrange a visit
- Answers & advice on products/applications
- Obtaining quotes & placing orders


