TDS Automatic Control

Intermittent Monitoring - Steam Boilers (Type BCS4)

Products used for automatic TDS control of larger steam boilers with an external intermittent monitoring sensor.

Intermittent Monitoring - Steam Boilers (Type BCS4)
 

Component Descriptions

Part Component Function
1 Check Valve to prevent backflow under abnormal conditions
2 TDS Control Valve to regulate the flow of the blowdown water
3 Isolating Valve to isolate the TDS control system from the blowdown line
4 Blowdown Controller to control the operation of the TDS control valve
5 Conductivity Sensor to monitor the conductivity of the boiler water
6 Sample Cooler to check the condition of the sample
7 Remote Display Unit to display the TDS reading at a remote position
Arrow Top
 

Table of Parts

Part Component Spirax Sarco Reference Product details
1 Check Valve DCV2 Wafer Check Valve Check Valves
2 TDS Control Valve BCV30 Electrohydraulically Actuated or BCV31 Pneumatically Actuated Blowdown Valve TDS Blowdown Controls
3 Stop Valve BSA Bellows Sealed Stop Valve Bellows Sealed Stop Valve
4 Controller BC3200 Controller TDS Blowdown Controls
5 Sensor Chamber S11 Sensor Chamber and CP10 Sensor  
6 Sample Cooler SC20 Sample Cooler System (optional to BCS3 System) Sample Coolers
7 Remote Display Unit DS1000 (optional) TDS Blowdown Controls

For more information on the BCS4 Blowdown Control System go to our TDS Blowdown Controls page.

Arrow Top

Hvad gør jeg nu?

Spirax Sarco have experienced engineers available to offer advice on these applications:

  • Let us help you size and select these products

  • Få en aftale med Spirax Sarco om et besøg på dit anlæg

  • Ask us a question about this application