Spirax Sarco België
Fax: +32 (0) 9 244 67 20
Info@be.SpiraxSarco.com
http://www.SpiraxSarco.com/be/dut/
Deconcentratiespui
During formation in the boiler, steam leaves behind impurities (TDS - total dissolved solids). If left these concentrate and cause damage to the boiler.
- High TDS results in plant & production problems
- Low TDS results in increased fuel & chemical treatment costs
Accurate blowdown methods are essential maintain your steam quality, contact our engineers for advice on the best methods for your business.
Niet alle producten zijn beschikbaar in alle markten. Kies uw Nationale Spirax-Sarco Website of Contacteer ons voor meer informatie.
What do I do now?
Find further information on Deconcentratiespui in the sections below, or get in touch for further assistance.
Contact us for advice from our engineers
- Help on sizing and selection
- Arrange a visit
- Answers & advice on products/applications
- Obtaining quotes & placing orders
Sales Brochures
Our brochures typically contain the concept, customer benefits and key features of the product.
| Title | Reference Number | Issue | File Size | ||
|---|---|---|---|---|---|
![]() |
Heat recovery from boiler blowdown | SB-P404-11 | 3 | 343 KB |
Technical Information
Use our technical information sheets for a full technical specification of the product. They typically include:
- Pressure/temperature limits
- Materials
- Sizes & connections
- Dimensions & weights
- Capacity charts
- Ordering information
| Title | Reference Number | Issue | File Size | ||
|---|---|---|---|---|---|
| BC3150 - Spuiregelaar | TI-P-403-91 | 84 KB | |||
| BC3250 - Spuiregelaar | TI-P-403-90 | 99 KB | |||
| BCS1 - Leidingset | TI-P-403-57 | 86 KB | |||
| BCV1 / BCV20 - Elektromagneetklep | TI-P-403-60 | 149 KB | |||
| BCV30 - Elektrische spuiregelklep | TI-P-403-29 | 228 KB | |||
| BCV31 - Pneumatische spuiregelklep | TI-P-403-36 | 178 KB | |||
| CP30 - Geleidbaarheidssonde | TI-P-403-49 | 154 KB | |||
| CP32 - Geleidbaarheidssonde | TI-P-403-59 | 124 KB | |||
| S20 / CP10 / TP20 - Geleidbaarheidssonde met kamer | TI-P-403-45 | 83 KB | |||
![]() |
BC3150 Blowdown Controller | TI-P403-91 | 3 | 151 KB | |
![]() |
BC3250 Blowdown Controller | TI-P403-90 | 3 | 131 KB | |
![]() |
BCS1 Pipeline Set | TI-P403-57 | 3 | 36 KB | |
![]() |
BCV1 and BCV20 Blowdown Valves | TI-P403-60 | 4 | 62 KB | |
![]() |
BCV30 DN20 - Blowdown Control Valve | TI-P403-29 | 11 | 496 KB | |
![]() |
BCV30 DN40 - Blowdown Control Valve | TI-P403-72 | 3 | 703 KB | |
![]() |
BCV31 DN20 - Blowdown Control Valve | TI-P403-36 | 8 | 257 KB | |
![]() |
BCV31 DN40 - Blowdown Control Valve | TI-P403-74 | 7 | 624 KB | |
![]() |
DS1000 Digital Display | TI-P403-41 | 3 | 77 KB | |
![]() |
SSC20 Sanitary Sample Cooler | TI-P403-82 | 3 | 123 KB |
Installation & Maintenance Instructions
Clear & accurate guidelines on installation & maintenance. They typically include:
- General safety information
- General product information
- Installation
- Commissioning
- Operation
- Maintenance
- Spare parts
Examples of Typical Solutions
Clear diagrams and descriptions on parts - This information helps you to understand the specific application of this product.
Steam Engineering Tutorials
Tutorials explaining the principles of steam and heat transfer, specific to this product section.
Calculators
The appropriate calculator to help designers and engineers select and size the products they need.
CAD Drawings
CAD drawings enabling you to see exactly how the product is constructed. You can also drop these into your own schematics.
Contact us for advice from our engineers
- Help on sizing and selection
- Arrange a visit
- Answers & advice on products/applications
- Obtaining quotes & placing orders


